On May 15th, the distributed photovoltaic power generation project with a capacity of approximately 1 megawatt on the roof of Shanghai Lingang Changshu Green Core City Industrial Park, which was invested, constructed, and operated by CCUI (Shanghai) Digital Technologies Co., Ltd., was successfully completed and connected to the grid. A completion ceremony and grid-connection ceremony were held in the Green Core City Industrial Park on the same day. Lingyu Yang the Chairman of Shanghai Lingang Changshu Green Core City Company, Tao Wang General Manager, Jianping Cao Deputy General Manager, Yong Shang Deputy General Manager, Bin Su Chairman of CCUI (Shanghai) Digital Technologies Co., Ltd, Ling Sun General Manager, Yu Su Deputy General Manager, and other leaders and partners attended the ceremony.
This project, officially launched on March 10, 2024, is a typical one that responds to the national policy of "dual carbon" targets, and firmly follows the path of transformation, upgrading, and green sustainable development. It has a great promoting effect on the development of local photovoltaic industry. With an installed capacity of about 1 megawatt, the project utilizes the roofs of 8 factories and installs 1565 pieces of 585Wp monocrystalline modules with concrete piers and steel supports. The entire project adopts the mode of "self-generation for self-use, surplus power for grid connection".
At the ceremony, CCUI (Shanghai) Digital Technologies Co., Ltd. conducted a special report on the project completion status, and thanked Shanghai Lingang Group for its strong support in the smooth and on-schedule grid connection of the project. At the same time, the two sides discussed their subsequent cooperation ideas and will further explore the investment and construction of energy centers and computing centers in industrial parks, as well as the construction of low-carbon, smart, and digital parks, in order to seek cooperation.
After the meeting, all leaders and guests visited the project site and took photos for memory.
Shanghai Lingang · Changshu Green Oasis Chip City Project is jointly built by Shanghai Lingang Group and Changshu City. The first development area covers 460 mu, with a total investment of 4.8 billion yuan and a total construction area of about 500,000 square meters. The photovoltaic power generation project launched this time is a solid foundation for CCUI (Shanghai) Digital Technologies Co., Ltd., Shanghai Lingang Group and Green Oasis Chip City Industrial Park to build an integrated demonstration park of "photovoltaic power storage and charging" in the future. The construction and demonstration of this project will substantially promote the energy conservation, emission reduction, low-carbon and green high-quality development of Shanghai Lingang Group and Changshu City, and play a positive role in promoting the research, exploration and development of the photovoltaic building integration segment.